Skončila 2. etapa oprav Karlova mostu = Second phase of repair works on Charles bridge finished

Saved in:
Bibliographic Details
Main Author: Drozd, Karel, 1930- (Author) 
Format: Article
Source document: Geotechnika , Roč. 14, 3 (2011), s. 3-10
Language:Czech
Genre/form:články
ISSN:1211-913X
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!
Cover Image
Status Sublibrary Description Location LCC Call number Old Call number
Regular loan NTK collection Roč. 14 (2011) č. 1-4 4th floor, shelf 4B/059 TA710 .A1 G462 v.14 no.1-4 R 14412/14